A quick update… the 20 roundels to be painted on the carriageway have
been ordered but I think our lining contractor has a backlog of work (and the carriageway needs to be dry) so that may take a few weeks. The rationalisation of the road signs in Ditton Road/Ellerton Road will be ordered shortly, our signing contractor is usually very quick so >that will be done as soon as I speak to them.
I am currently finishing the draft plans showing possible locations for double yellow lines based on our meeting. I am aiming to email these plans to you (as pdf’s) in the next day or two.