Archive

Archive for the ‘Traffic’ Category

Surbiton – extended road closure.

March 26, 2012 Leave a comment

Brighton Road/Upper Brighton Road, Surbiton will be closed at the railway bridge from March 28th to April 13th 2012 for bridge rebuilding followed by gas main work which will be to just past Lovelace Road from April 10th to May 8th 2012 .

Buses 71, 465, 514, K1, K4 and N65 will be diverted around this closure.

  

Advertisements
Categories: Local information, Traffic

Tolworth Broadway ‘Greenway.’

December 30, 2011 Leave a comment


The long discussed – going back several years – Tolworth Broadway improvement project – the ‘greenway’ was passed at a joint meeting of the South of the Borough and Surbiton Neighbourhood committees on December 15th.

Work on the £2.6 M project is expected to start in April 2012.

Full details can be found here: http://www.kingston.gov.uk/tolworth_newsletter_amended.pdf

 

A bench for the triangle

October 7, 2009 Leave a comment

Surbiton Neighbourhood Committee has agreed to install a small bench by the wayside garden (triangle) at the junction of Ellerton Road and Ditton Road.

Ward Councillors Nick Kilby and Paul Johnston were convincing in their argument that pedestrian residents might enjoy a a brief respite, carrying shopping bags from the bus stop in Ewell Road.

The Triangle garden.

Categories: Traffic Tags: , ,

Traffic news – from RBK Highways to EBRRA

July 16, 2009 Leave a comment

A quick update… the 20 roundels to be painted  on the carriageway haveEllerton Road race-track
been ordered  but I think our lining contractor has a  backlog of work (and the carriageway needs to be dry) so that may take a few  weeks. The rationalisation of the road signs in Ditton Road/Ellerton Road  will be ordered shortly, our signing contractor is usually very quick so  >that will be done as soon as I speak to them.

I am  currently finishing the draft plans showing possible locations for double yellow  lines based on our meeting.  I am aiming to email these plans to you (as pdf’s)  in the next day or two.

Categories: Traffic Tags: ,